...Lowering Risk, Raising Standards

Global Crane Services Provides 750-Tonne Crane for Installation of New Footbridge Over Levenmouth Railway

The bridge, which was placed into position over a four-day period using one of our 750-tonne cranes, will carry the core path between the communities of Methilhill and Kennoway.

11/06/24

Global Crane Services Provides 750-Tonne Crane for Installation of New Footbridge Over Levenmouth Railway

Network Rail recently completed the installation of a new footbridge over the Levenmouth railway at Duniface. Visible from the surrounding communities, the bridge sits 15m above the railway and the River Leven, and is already a significant landmark in the area at 144m long.

The bridge, which was placed into position over a four-day period using one of our 750-tonne cranes, will carry the core path between the communities of Methilhill and Kennoway. It’s the first of three new bridges that will be constructed along the new six-mile rail link, creating connections between the new railway stations at Leven and Cameron Bridge.

More